ELECTRICAL PROJECTS
CIVIL
UTILITY
GAS
RENEWABLES
ELECTRICAL
MARINE
ICONIC
CIVIL
UTILITY
GAS
RENEWABLES
ELECTRICAL
MARINE
ICONIC
Caltrans Route 210 Electrical Upgrades
Location:
Various Locations, CA
Owner:
California Department of Transportations (Caltrans)
Year Completed:
2020
The Route 210 overall project was broken into two phases which consisted of widening approximately 10 miles of the 210 freeway through the cities of La Cañada Flintridge, Glendale, and Pasadena, Ferreira Coastal the electrical subcontractor to Powell Constructors, Inc. for both phases of the project. The first phase included ramp metering, vehicle count stations, and lighting modifications in conjunction with the freeway’s widening. The second phase involved the installation of a new fiber optic communication system including mainline fiber and splicing using a rock wheel trencher, a closed-circuit television (CCTV) camera system, changeable message sign, and traffic monitoring stations along the freeway. Ferreira Coastal also installed new lighting and lighting control systems for three freeway tunnels in the Pasadena area.
Rte. 210
Foothill Freeway
State Route 210 is also known as the Foothill Freeway since it is connected to Interstate 210.