FERREIRA SOUTHEAST
Traveling South
In 2004, Ferreira recognized the need for storm restoration services in the southeast. Ferreira partnered with other contractors in these restoration efforts, leading to the opening of an office in Stuart, Florida. In 2017, Ferreira Southern expanded into Miami-Dade County, opening a second office location. Since then, Ferreira Southern has built a diverse team of individuals experienced in civil, utility, marine, electrical, and power construction. This depth of experience and knowledge allows Ferreira Southern to deliver the safest and highest quality of work on every project.
Ferreira Southeast Capabilities
CIVIL
Bridges
Highways
Underground Utilities
Sitework
Sign Structures
Directional Drilling
UTILITY
Substations
Power Plants
Transmission & Distribution
Emergency Response
ELECTRICAL
Traffic Signal & Safety Lighting
Street Lighting
Intelligent Transportation Systems
MARINE
Seawalls
Docks
Mechanical Dredging
Diving
Turnpike AET Phase 8
The Florida Turnpike Enterprise (FTE) is in the process of converting to All-Electronic Toll (AET) ticket system. The most critical element of this project is the removal of cash collection and replacement with AET because the entire 148 miles operates as a closed toll collection system. Ferreira Southern is responsible for the removal of 18 overhead static sign structures, the installation of 21,116 LF of conduit, using the directional bore method, and
122,143 LF of lighting conductors.