Ferreira Coastal was subcontracted to install the entire Lockheed Martin solar field, including 55,000 panels and associated ground mounts and racking. Ferreira Coastal also installed all associated electrical connections and inverters as well as the connection to Southern California Edison’s grid. This field will power Lockheed Martin’s research and development facility with the hope of generating extra power for the grid.
Best Energy/Industrial Project
Aug 24, 2022