ELECTRICAL PROJECTS

CIVIL

UTILITY

GAS

RENEWABLES

ELECTRICAL

MARINE

ICONIC

CIVIL

UTILITY

GAS

RENEWABLES

ELECTRICAL

MARINE

ICONIC

Moreno Valley ITS Deployment


Location:
Moreno Valley, CA

Owner:
City of Moreno Valley Transportation Engineering

Year Completed:
2020

The City of Moreno Valley adopted a Capital Improvement Plan for the fiscal years of 2019-2020 and 2020-2021. The plan was developed in correspondence with the infrastructure needs of the community and the city’s financial capacity. Part of the plan was to perform a total traffic integration for the city. Ferreira Coastal was the prime contractor for the job and was responsible for Closed Circuit Television (CCTV), fiber optics and equipment, and self-performed splicing and testing of fiber optic cable and system acceptance testing. Additionally, Ferreira Coastal installed Dynamic Message System boards and structures integrating Caltrans with the City of Moreno Valley.

2020

Winning Message

The Arizona Department of Transportation holds an annual safety message contest; the 2020 winning message was “signal and ready to mingle”.