FERREIRA SOUTHEAST

Traveling South

In 2004, Ferreira recognized the need for storm restoration services in the southeast. Ferreira partnered with other contractors in these restoration efforts, leading to the opening of an office in Stuart, Florida. In 2017, Ferreira Southern expanded into Miami-Dade County, opening a second office location. Since then, Ferreira Southern has built a diverse team of individuals experienced in civil, utility, marine, electrical, and power construction. This depth of experience and knowledge allows Ferreira Southern to deliver the safest and highest quality of work on every project.

Ferreira Southeast Capabilities

Ferreira civil icon

CIVIL

Bridges

Highways

Underground Utilities

Sitework

Sign Structures

Directional Drilling

Ferreira power icon

UTILITY

Substations

Power Plants

Transmission & Distribution

Emergency Response

Ferreira gas icon

ELECTRICAL

Traffic Signal & Safety Lighting

Street Lighting

Intelligent Transportation Systems

Marine Services

MARINE

Seawalls

Docks

Mechanical Dredging

Diving

Turnpike AET Phase 8

The Florida Turnpike Enterprise (FTE) is in the process of converting to All-Electronic Toll (AET) ticket system. The most critical element of this project is the removal of cash collection and replacement with AET because the entire 148 miles operates as a closed toll collection system. Ferreira Southern is responsible for the removal of 18 overhead static sign structures, the installation of 21,116 LF of conduit, using the directional bore method, and
122,143 LF of lighting conductors.

FERREIRA

NEW ENGLAND

SOUTHEAST

WEST COAST